BeforelvpOpen-room floor preparation
The existing surface exposed and prepared before the finished floor.
Actual Renew Repairs work
These are Val’s photographs from real flooring, tile, drywall, door, bathroom, and interior repair projects. No stock images are presented as completed work.
Before and after, shown side by side.
BeforelvpThe existing surface exposed and prepared before the finished floor.
AfterlvpDurable plank flooring aligned through the finished living space.
Before and after, shown side by side.
BeforelvpThe original carpeted landing documented before the flooring update.
AfterlvpDetailed edge and doorway work for a continuous finished floor.
Before and after, shown side by side.
BeforelvpExisting carpet documented before the hard-surface flooring update.
AfterlvpDurable plank flooring carried across the finished living space.
Before and after, shown side by side.
BeforetileExisting bathroom conditions documented before the tile update.
AftertileA detailed bathroom tile project completed with glass and trim.
In progress and after, shown side by side.
In progressdrywallAccess openings exposed during the stairwell repair process.
AfterdrywallA repaired stairwell section brought back to a clean surface.
In progress and after, shown side by side.
In progressdoorFraming and trim repair around an existing door opening.
AfterdoorA new double entry door fitted and finished inside the home.
Before and after, shown side by side.
BeforebathroomExisting bathroom conditions documented before the repair.
AfterbathroomA small bathroom updated with coordinated surfaces and fixtures.
AfterlvpA clean flooring update carried through the room and doorway.
AfterlvpA full-room LVP replacement with consistent plank alignment.
In progressdrywallDamaged ceiling sections exposed and prepared for rebuilding.
In progressdrywallTargeted overhead repair in progress around existing fixtures.
AfterrepairA durable hard-surface flooring update prepared for daily use.